The pit had cracked sides and bottom surfaces & water leaked in during the rainy season. It was really too shallow to be useful & rather than rebuild it, while replacing the driveway we went ahead & had this filled in also.
The City of San Diego would not allow us to rebuild the driveway out of real red brick in the public right-of-way, which covered all of the apron & over 4 feet of driveway up from the sidewalk. So we did the next best thing, using stamped concrete to approximat e the original look as much as possible.
Links To Blog Posts:
1. Discovering a Cliff May Home | 2. Comparing to known Cliff May designs | 3. Olive Tree | 4. Floor Plan | 5. Backyard Brick Path and Clothesline | 6. Pine Tree | 7. Driveway & Mechanic's Pit | 8. Wild Parrots | 9. Misc Pics
No comments:
Post a Comment